hra fb twitter
sheffield
header

Build Diary entries for January 2016

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2016 Next Month la
Left hand Motion Bracket progress (1)
07/01/2016
  Highslide JS
  The left hand motion bracket will be fabricated and machined locally in Sheffield and rapidly follows the right hand motion bracket.

The image above shows the fabrication model for the left hand motion bracket
   
Left hand Motion Bracket progress (2)
07/01/2016
  Highslide JS
  The image above shows the 3D model for the machining of the left hand motion bracket.