hra fb twitter
sheffield
header

Build Diary entries for June 2018

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2018 Next Month la
Frame Keeps ready for Assembly
06/06/2018
  Highslide JS
  These are the 6 frame keeps which have completed machining and are now ready for the frame assembly. The frame keeps bolt to the cast steel stretchers and tie the open ends of the horn blocks cut out area in the frame together, thus resisting the spreading of the horn block area. The frame keeps also retain the driving wheel axle boxes should the locomotive be lifted.