fb twitter
sheffield
header
 

Build Diary entries for May 2026

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2026    
Coupled Wheel Axles Arrive
05/05/2026
  Highslide JS
  Today, our axles for the coupled wheels arrived on site. One large box containing 2 axles, one smaller box containing one. The axles are well coated with preservative oil and cloth. Te axles are just over 1.6 metres in length and are 228 mm in diameter at the wheel seat.The axles will now go into storage until we are ready for wheel assembly. Our aim is to place and order for casting the cannon axleboxes this week.
   
A Pair of Axles
05/05/2026
  Highslide JS
  The axles have been well coated with preservative oil and cloth