Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.
| Cab Roof Assembly |
| 02/03/2026 |
| |
 |
| |
The cab roof was despatched to Brightstar Shotblasting and Coatings in Sheffield last week for blast cleaning. It had spend a while out of doors at Quorn and then at Diamond Engineering (CTL Seal) so it needed a bit of TLC. It was returned to us today and was promptly fitted to the cab frame.
|
| |
|
| Drivers Screen Window Frame |
| 02/03/2026 |
| |
 |
| |
The Drivers Screen Window Frame comes in an inside frame and an outside frame. Here Mike is riveting the outside frame to the steel panel using an air riveter. The inside frame is used to hold the glass in place and is secured to the outer frame with sleeve nuts. |
| |
|