Build Diary entries for November 2026
Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.
| Buffer Dismantling |
| 09/11/2026 |
| |
 |
| |
The assembly shop at Diamond Engineering is very busy at the moment and space is at a premium. In order to maximise available space, we were asked to remove the buffers and drawhook from 72010. This seemed a good opportunity to dismantle the buffers for an overhaul. The buffers have a back plate which partially compresses the spring; this is held on by 4 countersunk head screws. As the buffers were acquired by the project some time ago, the screws were well rusted in so we have had to drill them out with the magnetic drill. Before attempting this, threaded bar was used to hold the plate in place while we drilled the screws out. Once all screws were removed, Mike and Jim carefully undid the nuts on the threaded bar to allow us to remove the spring. |
| |
|