Build Diary entries for September 2015

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2015 Next Month la
Engineering Update (2)
06/09/2015
  pic
  The exhaust steam spider pattern has been delivered to Boro Foundry to be prepared for casting. This is one of the last major components required for the frame assembly.
   
Engineering Update (1)
06/09/2015
  pic
  Smokebox update

The smokebox assembly is now being completed at Ian Riley and Son engineering in Bury ready for display at upcoming events in the celebrity presence of Flying Scotsman no less! Photos soon...
New components

The slide bar brackets (shown above) have been completed at Boro foundry and await machining.