hra fb twitter
sheffield
header

Build Diary entries for November 2012

Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.

la Previous Month uparrow Return to 2012 Next Month la
Build Plan Announced
28/11/2012
  Highslide JS
  A high level overview of our 14 year build plan has now been released which shows our goals over the next 14 years.

The detailed version of this document is key to the locomotive build and will guide which order, when and how the components are manufactured and built in to sub-assemblies (such as the front bogie) and finally the main assembly of the locomotive.

As the Build Plan shows we are already ahead of schedule with the large number of components that we hold in stock. Already we could have multiple components being manufactured at once but like any projects such as this, our only limit factor is the rate of funding so please consider becoming a member, monthly donator or make a one off donation using our new Donate button below (PayPal). We also sell Hengist branded or 'Cycling Lion' branded items and shed plate fridge magnets in our shop. Any donation large or small will help us to build the Clan faster and return a previously extinct BR Standard Class back to the countries mainlines for all to enjoy.