Build Diary entries for January 2015
Here are the diary entries for this month. You can use the forward and backward links to see the next or previous months. Most photos taken before 2018 are small size. From 2018 onwards, most photos you see below will have a link to a full size image by clicking on the photo.
Previous Month | Return to 2015 | Next Month |
Tie Bar fabricated and machined | |
23/01/2015 | |
The tie bar that fits at the rear of the frames has now been completed along with the pins. The brackets are having their bushes machined. The next job is the machining of the 'bread basket' stretcher SL/DE/21990 which will be completed shortly. |
|